Hazy DazeUpdated a day ago
Minibrew Brewpacks are the recipe kits required to brew small-scale batches of home-brew beer using the Minibrew; a selection can be found in the shop.
You can find details about each recipe in our shop. However, these packs are sometimes out of stock and can't be found on our website.
The brewing part on the base station always follows the same steps: mixing the malt, adding hops to the carousel, mashing, boiling and cooling.
The fermentation part in the keg differs alot between recipes, so a schedule can be found below.
Hazy Daze
Hazy Daze is a fresh and fruity session IPA. The flaked grains give the beer a hazy color and a smooth mouthfeel. The beer is dry-hopped with Mosaic and El dorado, which gives it its tropical character. Due to the low amount of grains in this beer, the alcohol level is lower than in a standard beer, making this beer delightfully sessionable.
- Fermentation time: 14 days.
- Ready to drink: 14-16 days (carbonation grade is up to personal preference).
- Abv: ~4%.
What's included?
- 1x Mixed crushed malt (barley, flaked wheat, flaked oats, flaked barley)
- 1x Boil ingredient bag (bitter hop pellets)
- 1x Dryhop bag (aroma hop pellets)
- 1x Dry yeast package (US-05)
Fermentation schedule:
Primary:
- Add the yeast into the keg;
- Attach the airlock to the keg post (located in the middle of the keg lid);
- Attach the trub container to the bottom of the keg;
- Add the dryhop to the keg;
- The keg controlls the temperature at 19C for 3 days.
- The keg controlls the temperature at 25C for 1 day.
Conditioning 1:
- The keg controlls the temperature at 25C;
- Remove the trub container and empty its contents;
- Replace the trub container.
Conditioning 2:
- The keg controlls the temperature at 5C for 1 day;
- Remove the trub container and empty its contents;
- Replace the trub container.
Conditioning 3:
- The keg controlls the temperature at 5C for 1 day;
- Remove the trub container and empty its contents;
- Replace the trub container.
Conditioning 4:
- The keg controlls the temperature at 5C for 1 day;
- Remove the trub container and empty its contents;
- Replace the trub container.
Conditioning 5:
- The keg controlls the temperature at 5C for 1 day;
- Remove the trub container and empty its contents;
- Replace the trub container.
Conditioning 6:
- The keg controlls the temperature at 5C for 3 days;
- Remove the trub container and empty its contents.
Carbonation/Serving:
- Attach a cartridge to the pressure regulator.
- Attach a black ball lock connector to the regulator.
- Mount the regulator on the keg post with CO2 text.
- Open the regulator and wait 1 day.
- Replace the cartridge and wait 1 more day.
- Connect the tap to a black ball lock connector and attach it to the keg post with TAP text.
- Release the pressure inside the keg by gently lifting the overpressure valve.
- Pressure the keg to 5psi for a proper tapping flow and tap your beer!